We're Maintexx, a fit-out contractor in Musaffah, Abu Dhabi. We prepare and submit the drawings for Abu Dhabi Municipality, Civil Defence, the power utility and your landlord, chase every comment, and book the final inspections, so your project never stops for paperwork.
What Maintexx does for authority approvals, in four lines
Most approval delays come from incomplete drawings, not the authorities. At Maintexx, we design to code from the first sketch and submit complete packs the first time.
Fit-out and modification permits under the Department of Municipalities and Transport, checked for layout, occupancy, room sizes and structural changes.
Fire alarm, sprinklers, emergency lighting, exits and escape routes drawn, submitted and approved before work starts.
NOCs and design approval to each building's fit-out guide, including mall design manuals and free zone authority rules.
Final inspections booked and attended, comments closed, and completion certificates handed over so you can open.
Most commercial fit-outs in Abu Dhabi need these three, plus ADDC (now TAQA Distribution) when the electrical load changes.
Fit-out or modification permit. Needs layouts, sections, finishes and your trade licence.
Fire and life safety approval, then inspection and a completion certificate.
NOC and design approval to the building's fit-out guide, often with a deposit.
A rejection usually comes down to a few specific comments. At Maintexx, we read each comment, fix the drawings, meet the reviewer where needed and resubmit quickly, so a rejection costs days, not months.
Check the site and building rules.
Drawings to code from day one.
Landlord approval first.
ADM, ADCD and ADDC packs.
Exactly to approved drawings.
Certificates and handover.
Building without a permit can mean fines, a stop-work order or tearing work out. We don't start until the approvals are in place.
Premium finishes still have to pass Civil Defence. We check fire ratings for boards, doors, fabrics and panels before ordering, and keep the certificates on file.
We book inspections early, test every system before the inspector arrives and close comments the same week, so opening day holds.
At Maintexx, approvals are included in every turnkey fit-out, and we also offer approvals as a standalone service.
Drawings, submissions and follow-up for your own contractor.
Get a quoteDesign, all permits, build and final certificates in one contract.
Get a quoteUsually a landlord NOC, an Abu Dhabi Municipality fit-out permit and Abu Dhabi Civil Defence approval, plus ADDC (now TAQA Distribution) when the electrical load changes. At Maintexx, we handle all of them.
With Maintexx, most commercial fit-out approvals take about 2 to 4 weeks when the drawings are complete the first time.
Yes. At Maintexx, we review the comments, correct the drawings and resubmit, and we can take over submissions started by others.
Both. Maintexx includes approvals in every turnkey fit-out from AED 50,000, and also offers approvals as a standalone service.
Send us your layout and lease. Maintexx will tell you exactly which approvals apply and how long they'll take.
Enquire Now